Gear Works, Inc.

mikron model 79 Hobber

[ Home ]   [ Gear Division ]    [ Machine Division ]       [ Links ]

Mikron model 79 Rebuild Details

Inclusive of, but not limited to:

  • Complete disassembly of machine.
  • Preserve original, enamel finish, or prime and paint with Polane.
  • Replace all ball, roller, and thrust bearings.
  • Replace work spindle with new tool steel spindle.
  • Scrape and fit work spindle, bronze bearings for alignment with fixed tail stock.
  • Inspect and rework or replace hob spindle as necessary.  At minimum requires grinding of locating tapers.
  • Scrape spindle housing tapers for alignment and fit with spindle.
  • Scrape bed ways parallel to work spindle.
  • Scrape column square and to fit bed ways.
  • Pad or replace gibs as necessary, scrape gibs to fit.
  • Scrape hob slide to fit column.
  • Replace feed rack and worm as necessary.
  • Replace indexing worm and wheel as necessary.
  • Replace or repair driven pulley shaft as necessary.
  • Replace and fit bronze bearing to support driven pulley shaft.
  • Replace gimbal, pivot pins as necessary.
  • Repair or replace drive motor as necessary.
  • Replace flat, drive belt.
  • Overhaul cutting oil, gear pump.
  • Replace oil lines.
  • Replace wiring and electrical controls as necessary.
  • Reassemble, adjust all settings, final inspect alignments, and cycle for function.

 

                           

[ Home ]    [ Gear Division ]    [ Machine Division ]   [ Links ]